This shows you the differences between two versions of the page.
Both sides previous revision Previous revision Next revision | Previous revision | ||
nonepromprocess2g [2018/11/11 16:56] twdorris [Adapter Plug] |
nonepromprocess2g [2024/03/15 11:16] (current) |
||
---|---|---|---|
Line 38: | Line 38: | ||
- | The final step is to snap our specially designed conversion board into place. The following picture shows the finished result (click to enlarge). Note the machined mounting bar and machined spacers used to secure the board in place using the mounting points provided in the factory ECU case bottom. There is a LOT of manual, custom work done to produce these boards. | + | The final step is to snap our specially designed conversion board into place. The following picture shows the finished result (click to enlarge). Note the machined mounting bar and machined spacers used to secure the board in place using the mounting points provided in the factory ECU case bottom. There is a LOT of manual, custom work done to produce these boards. |
- | {{:2gnoneprom2.jpg?direct&281x212 }} | + | |{{:2gnoneprom2.jpg?nolink&281x212 }} | |